Détail de l'auteur
Auteur Marija Savanović, |
Documents disponibles écrits par cet auteur (1)
Ajouter le résultat dans votre panier Affiner la recherche Interroger des sources externes
Proposed design of local 2D geodetic network for the construction of the tunnel part of the Belgrade metro / Marija Savanović, in Geodetski vestnik, vol 59 n° 3 (September - November 2015)
[article]
Titre : Proposed design of local 2D geodetic network for the construction of the tunnel part of the Belgrade metro Type de document : Article/Communication Auteurs : Marija Savanović,, Auteur ; Rajko Savanović, Auteur ; Toša Ninkov, Auteur ; et al., Auteur Année de publication : 2015 Article en page(s) : pp 564 - 576 Note générale : Bibliographie Langues : Anglais (eng) Descripteur : [Vedettes matières IGN] Topographie
[Termes IGN] Belgrade
[Termes IGN] lever souterrain
[Termes IGN] modèle de Gauss-Markov
[Termes IGN] précision du positionnement
[Termes IGN] réseau ferroviaire
[Termes IGN] réseau géodésique planimétrique
[Termes IGN] réseau géodésique spécifique
[Termes IGN] tunnelRésumé : (Auteur) This paper presents a method of optimization of the underground network for the construction of the Belgrade metro. In the process of optimization, the method of preanalysis was used. The theoretical basis of the mathematical model of the preanalysis is given, which is based on Gauß-Markov model of geodetic networks adjustment, as well as the theoretical basis for calculating the tunnel breakthrough precision. Based on the construction standards, the calculation of the required breakthrough precision was made, as the fundamental criterion of precision for the development of the underground tunnel network. Depending on the technical parameters of the Belgrade Metro Line 1 alignment, related to the position of the axis and the longitudinal profile of the tunnel, the design of the underground tunnel network was defined. In the process of optimization, different plans of observations were analyzed, as well as the results obtained from the preanalysis for each plan individually. Based on the set criterion of maximum transverse error of the tunnel breakthrough, which is 4.5 cm,the third plan of observations was adopted as the final plan,by which the breakthrough error of 3.5 cm was achieved. The adopted plan of observations includes planned measurements of horizontal directions, azimuths, and distances, with the assumed standard deviation of 1" for horizontal directions,3.2 " for azimuths, and (1 mm; 1 ppm) for distances. Numéro de notice : A2015-572 Affiliation des auteurs : non IGN Thématique : POSITIONNEMENT Nature : Article DOI : 10.15292/geodetski-vestnik.2015.03.564-576 En ligne : https://dx.doi.org/10.15292/geodetski-vestnik.2015.03.564-576 Format de la ressource électronique : URL article Permalink : https://documentation.ensg.eu/index.php?lvl=notice_display&id=77799
in Geodetski vestnik > vol 59 n° 3 (September - November 2015) . - pp 564 - 576[article]Exemplaires(1)
Code-barres Cote Support Localisation Section Disponibilité 139-2015031 RAB Revue Centre de documentation En réserve L003 Disponible